MRP –

Utilizing the Step-by-Step MRP Calculation Process, students will solve the following MRP problem given: Product A is an end item and is made from two units of B and four of C. B is made of three units of D and two of E. Product C is made of two units of F and two of E. Product A has a lead-time of one week. Products B, C and E have lead-times of two weeks. Products D and F have a lead-time of three weeks.
 
a. Show the bill of material (product structure tree). 

b. If 100 units of A are required in week 10, develop the MRP planning schedule, specifying when items are to be ordered and received. There are currently no units of inventory on hand.

 
Grading Criteria:

 NEED 1,000 words

  1. Student will demonstrate their relevant knowledge of MRP
  2. Apply critical thinking in applying MRP concepts
  3. Create an Master Production Schedule and a Material Requirement Planning Chart
  4. If there is a positive net requirement in a week, backward schedule by the lead-time and enter the quantity for the planned order release that will satisfy the net requirement.
  5. The student applied correct APA, style, usage, grammar, and punctuation.
 

We are the Best!

course-preview

275 words per page

You essay will be 275 words per page. Tell your writer how many words you need, or the pages.


12 pt Times New Roman

Unless otherwise stated, we use 12pt Arial/Times New Roman as the font for your paper.


Double line spacing

Your essay will have double spaced text. View our sample essays.


Any citation style

APA, MLA, Chicago/Turabian, Harvard, our writers are experts at formatting.


We Accept

Secure Payment
Image 3